45mmscfd Sour Gas Plant Expansion

45mmscfd Sour Gas Plant Expansion:

Project kick-off to start up 15 months.  A 3D laser scan of the site was captured and implemented into the design model. The brownfield project required integrating new equipment with existing infrastructure. Aximus provide all discipline engineering services and leveraged off our sub-contractor partnerships to deliver the project on budget ($27MM). The project included:

Contact Us